Thursday, November 12, 2015

09/15-11/12/15

09/07/15

  • We bought materials to re epoxy the floor.
09/14/15
  • Moved allot of materials and the work benches back into the blockhouse from various locations.
10/07/15
  • Framed the back wall, moved Vegeta into the blockhouse, and covered certain parts of the block house to prevent damage from contractors.
10/14-11/07

  • Contractors worked on blockhouse for several weeks. They did the drop ceiling, did all the electrical work and installed a new heating/ac unit.
Still waiting for wi-fi.

11/16/15
  • going to put in sink.