- We bought materials to re epoxy the floor.
09/14/15
- Moved allot of materials and the work benches back into the blockhouse from various locations.
10/07/15
- Framed the back wall, moved Vegeta into the blockhouse, and covered certain parts of the block house to prevent damage from contractors.
10/14-11/07
- Contractors worked on blockhouse for several weeks. They did the drop ceiling, did all the electrical work and installed a new heating/ac unit.
Still waiting for wi-fi.
11/16/15
- going to put in sink.