- Moved everything out of the blockhouse to various locations.
- Etched the floor with acid and one day later epoxied.
- Removed the water fountain.
- Primed and painted the part of the wall behind the fountian .
- Continued to do touch ups with the facade and outside walls.
Thursday, August 20, 2015
8/10-13
Thursday, August 6, 2015
08/03-06
- Still doing paint touch-ups
- stem reunion on 08/04
- started cleaning out the blockhouse on 08/06
Monday, August 3, 2015
7/30
- Still painting various things, the pipes, the walls, touch ups for the facade.
- Filled the wall holes where the back wall meets the facade
goals for 8/3
- touch up the facade.
- orange trim around the door and repaint the walls.
- 2nd coat of paint on the inner walls, both blue and water proof paint.
- look into epoxying the floor and drop ceiling.
Subscribe to: