8/10-13


  • Moved everything out of the blockhouse to various locations.
  • Etched the floor with acid and one day later epoxied.
  • Removed the water fountain.
  • Primed and painted the part of the wall behind the fountian .
  • Continued to do touch ups with the facade and outside walls.

Thursday, August 6, 2015

08/03-06


  • Still doing paint touch-ups
  • stem reunion on 08/04
  • started cleaning out the blockhouse on 08/06

Monday, August 3, 2015

7/30


  • Still painting various things, the pipes, the walls, touch ups for the facade.
  • Filled the wall holes where the back wall meets the facade


goals for 8/3


  • touch up the facade.
  • orange trim around the door and repaint the walls.
  • 2nd coat of paint on the inner walls, both blue and water proof paint.
  • look into epoxying the floor and drop ceiling.