Monday, August 3, 2015

7/30


  • Still painting various things, the pipes, the walls, touch ups for the facade.
  • Filled the wall holes where the back wall meets the facade


goals for 8/3


  • touch up the facade.
  • orange trim around the door and repaint the walls.
  • 2nd coat of paint on the inner walls, both blue and water proof paint.
  • look into epoxying the floor and drop ceiling.

No comments:

Post a Comment