Thursday, August 20, 2015

8/10-13


  • Moved everything out of the blockhouse to various locations.
  • Etched the floor with acid and one day later epoxied.
  • Removed the water fountain.
  • Primed and painted the part of the wall behind the fountian .
  • Continued to do touch ups with the facade and outside walls.

No comments:

Post a Comment