Friday, May 27, 2016

Summer 2016! 05/23/16

With the end of the Spring semester, the Blockhouse project is set back into motion with old and new members alike.

Past Blockhouse Exterior


Present Blockhouse Exterior


The Blockhouse is now a functional workshop where STEM students store project equipment and work. It has come a long way, however, there is still plenty of work to do.

Goals for the Summer

  • Fix Door Leak


When it rains, water rolls down the east door and leaks into the Blockhouse.
  • Adjust Drain


New asphalt was added by the garage door, raising the ground level; as a result, a puddle of water floods the area and obstruct productivity.
  • Install Window


We had installed a temporary air conditioner to keep the crew cool during the last summer. This air conditioner will be replaced by a glass window.

No comments:

Post a Comment